In Eurohinca we are specialists in the execution of tunnels for pipelines with tunnel boring machines. Since its foundation in 1996 Eurohinca has executed different types of works:
Two microtunnels with closed shield tunnel boring machine, from the Moncofar desalination plant out to sea. Rescue by marine means.
Construction of a submarine outfall to collect water for the turbot fish farm in Camariñas (A Coruña).
Execution of six submarine outfalls with closed hydro-shield tunnel boring machine. Three land outfalls and three outfalls with marine rescue.
Execution of three submarine outfalls in the Ceyranbatan UF project, one of the largest surface water ultrafiltration plants in the world.
Execution of a sewage collector in the expansion works of the WWTP of Ciudad Real.
Construction of a collector consisting of the general interceptor of the Nalón river with a length of more than 3.5 km and several branches.
Construction of 1300 ml of tunnel in the works of the Valdemarín Storm Pond.
Construction of the Villalba (Madrid) collector by means of a tunnel boring machine with segments.
Construction of two microtunnels included in the Lagares WWTP expansion and modernization project (Vigo).
Execution of two pile driving sections in the Project for the Recovery of the hydraulic public domain in the Arroyo de Las Flores, municipality of San Ildefonso-La Granja (Segovia). More information about the project
Design and execution of a 230 m microtunnel crossing the Manises airport (Valencia).
Design and execution of a microtunnel crossing the airport of Vigo (Pontevedra).
Construction of a microtunnel with a closed shield tunnel boring machine under the Bargas-Mocejón AVE platform.
Construction of two driving sections under the Lima River (Portugal).
Execution of a pile driving in a curve under the Puertollano road (Ciudad Real).
Construction of two pile driving sections in the center of Salamanca, as part of the Paseo de la Estación urban development project.
Pile driving in curve under buildings in Santiago de Compostela.
Pipe jacking parallel to the El Sobaco tunnel, overcoming a major geological obstacle.
Execution of a curved drive both in elevation and in plan, passing under the BI-2701 road and the Barbadún River.
Construction of an access gallery more than 30 m long with a 36% slope using an open shield TBM in El Cañaveral (Madrid).
Design and execution of several microtunnels in the urbanization El Cañaveral (Madrid) with a closed shield tunnel boring machine using an excavator.
In recent years EUROHINCA has been committed to internationalization, successfully executing projects in countries as diverse as Qatar, Azerbaijan, Mexico, Italy and Portugal. We are also very active commercially in other countries in Latin America and the Middle East.
Eurohinca has executed several microtunnels in Mexico, such as the El Zapote and San Martín de las Flores collectors, among others.
Eurohinca's projects in Italy include the A1 freeway crossing in Parma and the crossing of the Naviglio canal.
Eurohinca has executed in Qatar several microtunnels of different diameters and lengths.
Execution of three submarine outfalls in the Ceyranbatan UF project, one of the largest surface water ultrafiltration plants in the world.