eurohinca logo

THE FIRST COVE OF 2017 PUTS AN END TO 170 M OF MICROTUNNEL IN DN2500 DRILLED IN GRANITE

T.B.M. breakthrough in the 2nd driving section executed on the Recovery of the hydraulic public domain in the Las Flores stream, municipality of San Ildefonso-La Granja (Segovia).

the farm