SOUTH TEXAS - TUXPAN, ALTAMIRA LANDFALL

Within the framework of the project South Texas - Tuxpan Gas Pipeline Terratest Tunnelling has developed the design and construction of the Altamira branch line: world record of 2246 m excavated with a hydroshield TBM with reinforced concrete pipe ramming and underwater rescue of the TBM.