NEW PUMPING STATION PS16N & INTERCEPTOR SEWER (QATAR)

To perform a tunneling operation with a tunnel boring machine and finish a tunnel is an achievement. Completing two tunnels in the same shaft simultaneously is a success. Herrenknecht TBM AVN 800 and Herrenknecht TBM AVN 1200. Sharq Village Area (Qatar).

new pumping station