ON THE NETWORKS
![news](https://eurohinca.com/wp-content/uploads/2024/02/TweetAcuaes.jpg)
ACUAES mentions in its Twitter account the breakthrough of the second tunnel of the Lagares project. More information
CONFERENCE ON SPANISH GEOTECHNICAL ACTIVITIES ABROAD
![conference on spanish geotechnical activities abroad](https://eurohinca.com/wp-content/uploads/2024/02/emisario-submarino-hinca-tuberia.jpg)
Marc Martí, general manager of Eurohinca, presents his lecture Execution of subway hydraulic works with hydroshield tunnel boring machine in Azerbaijan. More information
NEW PUMPING STATION PS16N & INTERCEPTOR SEWER (QATAR)
![new pumping station](https://eurohinca.com/wp-content/uploads/2024/02/New-Pumping-Station-PS16N-Interceptor-Sewer-big.jpg)
To perform a tunneling operation with a tunnel boring machine and finish a tunnel is an achievement. Completing two tunnels in the same shaft simultaneously is a success. Herrenknecht TBM AVN 800 and Herrenknecht TBM AVN 1200. Sharq Village Area (Qatar).