{"id":5622,"date":"2026-06-05T07:23:15","date_gmt":"2026-06-05T07:23:15","guid":{"rendered":"https:\/\/eurohinca.com\/?p=5622"},"modified":"2026-06-05T07:23:18","modified_gmt":"2026-06-05T07:23:18","slug":"what-should-be-included-in-a-geotechnical-report-to-select-the-appropriate-trenchless-technology","status":"publish","type":"post","link":"https:\/\/eurohinca.com\/en\/que-debe-incluir-un-informe-geotecnico-para-seleccionar-la-tecnologia-sin-zanja-adecuada\/","title":{"rendered":"What should a geotechnical report include to select the appropriate trenchless technology?"},"content":{"rendered":"<p data-start=\"150\" data-end=\"557\">A geotechnical report for selecting a trenchless technology should include sufficient information about the terrain, groundwater and construction risks of the route. At a minimum, it should provide <strong data-start=\"355\" data-end=\"556\">boreholes, geological profile, water table, laboratory tests, granulometry, presence of rock or boulders, permeability, soil aggressiveness, strength parameters and geotechnical variability.<\/strong>.<\/p>\n<p data-start=\"559\" data-end=\"897\">This information makes it possible to assess whether the project can be implemented through <a class=\"decorated-link\" href=\"https:\/\/eurohinca.com\/en\/pipe-jacking-2\/\" target=\"_new\" rel=\"noopener\" data-start=\"633\" data-end=\"697\">pipe ramming<\/a>, <a class=\"decorated-link\" href=\"https:\/\/eurohinca.com\/en\/horizontal-directional-drilling\/\" target=\"_new\" rel=\"noopener\" data-start=\"699\" data-end=\"791\">horizontal directional drilling<\/a>, <a class=\"decorated-link\" href=\"https:\/\/eurohinca.com\/en\/direct-pipe\/\" target=\"_new\" rel=\"noopener\" data-start=\"793\" data-end=\"845\">Direct Pipe<\/a> or microtunnel with open shield, EPB or hydro-shield.<\/p>\n<h3 data-section-id=\"1sojr4f\" data-start=\"899\" data-end=\"945\">Minimum recommended geotechnical information<\/h3>\n<p data-start=\"947\" data-end=\"1202\"><strong data-start=\"947\" data-end=\"988\">Borings and reconnaissance of the terrain:<\/strong> location, depth, spacing between investigation points, cores, stratigraphic description and relation to the planned layout. They must cover the zone of advance and the areas of attack and reception wells.<\/p>\n<p data-start=\"1204\" data-end=\"1427\"><strong data-start=\"1204\" data-end=\"1242\">Geological and hydrogeological profile:<\/strong> definition of strata, material changes, transition zones, fills, rock, mixed soils, fracturing, cavities, discontinuities, water table and possible water pressures.<\/p>\n<p data-start=\"1429\" data-end=\"1717\"><strong data-start=\"1429\" data-end=\"1466\">Laboratory and in situ tests:<\/strong> granulometry, Atterberg limits, natural moisture, density, strength, abrasiveness, permeability, SPT\/CPT tests if applicable, simple compression in rock and other parameters necessary to estimate face stability, thrust and excavability.<\/p>\n<p data-start=\"1719\" data-end=\"1958\"><strong data-start=\"1719\" data-end=\"1757\">Presence of water and permeability:<\/strong> measured water table, seasonal variations, water pressure, soil permeability, risk of inflows, fines entrainment and need for pumping, treatments or pressure systems.<\/p>\n<p data-start=\"1960\" data-end=\"2171\"><strong data-start=\"1960\" data-end=\"1989\">Problematic materials:<\/strong> boulders, blocks, abrasive rock, mixed soils, open gravels, saturated sands, expansive clays, anthropic fills, contaminated soils, cavities or very heterogeneous layers.<\/p>\n<p data-start=\"2173\" data-end=\"2643\"><strong data-start=\"2173\" data-end=\"2219\">Parameters for the choice of tunnel boring machine:<\/strong> face stability, grain size, cohesion, friction angle, abrasiveness, rock strength, water pressure and behavior of the excavated material. These data are essential to decide between <a class=\"decorated-link\" href=\"https:\/\/eurohinca.com\/en\/open-shield\/\" target=\"_new\" rel=\"noopener\" data-start=\"2427\" data-end=\"2485\">open shield<\/a>, <a class=\"decorated-link\" href=\"https:\/\/eurohinca.com\/en\/closed-shield-epb\/\" target=\"_new\" rel=\"noopener\" data-start=\"2487\" data-end=\"2549\">EPB tunnel boring machine<\/a> o <a class=\"decorated-link\" href=\"https:\/\/eurohinca.com\/en\/closed-shield-hydroshield\/\" target=\"_new\" rel=\"noopener\" data-start=\"2552\" data-end=\"2642\">hydro-shield for water-logged terrain<\/a>.<\/p>\n<p data-start=\"2645\" data-end=\"2970\"><strong data-start=\"2645\" data-end=\"2688\">Data for wells and auxiliary civil works:<\/strong> depth of excavation, slope stability or support, lateral thrusts, seepage, pit bottom, need for waterproofing, soil treatments and soil conditions, etc. <a class=\"decorated-link\" href=\"https:\/\/eurohinca.com\/en\/vertical-wells\/\" target=\"_new\" rel=\"noopener\" data-start=\"2883\" data-end=\"2969\">vertical pits for driving and microtunneling<\/a>.<\/p>\n<h3 data-section-id=\"17er8p7\" data-start=\"2972\" data-end=\"3035\">How the geotechnical report influences the trenchless solution<\/h3>\n<p data-start=\"3037\" data-end=\"3281\">The geotechnical report conditions the choice of method, type of TBM, borehole design, expected thrust, lubrication, slurry management, expected performance, settlement risks and overall project cost.<\/p>\n<p data-start=\"3283\" data-end=\"3676\">For example, stable soils with low water presence may allow for open shield solutions. Cohesive or conditionable soils may be conducive to EPB. Saturated, permeable soils or soils with significant water pressure may require hydro-shielding. In long, complex crossings or with special layouts, it may also be necessary to compare alternatives such as HDD or Direct Pipe.<\/p>\n<p data-start=\"3678\" data-end=\"4113\">In projects under roads, railroads, waterways, urban areas or utilities in operation, the quality of the geotechnical report is critical to reduce uncertainty, define monitoring controls and anticipate risks on the infrastructure crossed. This is especially important in <a class=\"decorated-link\" href=\"https:\/\/eurohinca.com\/en\/infrastructure-crossings\/\" target=\"_new\" rel=\"noopener\" data-start=\"3971\" data-end=\"4053\">infrastructure crossings<\/a> o actions with hydraulic and environmental conditions.<\/p>\n<p data-start=\"4115\" data-end=\"4448\"><strong data-start=\"4115\" data-end=\"4159\">Minimum checklist of the geotechnical report:<\/strong> boreholes, stratigraphic profile, water table, permeability, granulometry, resistance tests, abrasiveness, presence of boulders or rock, soil variability, chemical aggressiveness, thrust parameters, geotechnical risks, well conditions and construction recommendations.<\/p>\n<p data-start=\"4450\" data-end=\"4646\"><strong data-start=\"4450\" data-end=\"4458\">C<\/strong>Request a <a class=\"decorated-link\" href=\"https:\/\/eurohinca.com\/en\/request-offer\/\" target=\"_new\" rel=\"noopener\" data-start=\"4472\" data-end=\"4600\">technical geotechnical review to select appropriate trenchless technology<\/a> before closing the route or putting the work out to bid.<\/p>","protected":false},"excerpt":{"rendered":"<p>Un informe geot\u00e9cnico para seleccionar una tecnolog\u00eda SIN zanja debe incluir informaci\u00f3n suficiente sobre el terreno, el agua subterr\u00e1nea y los riesgos constructivos del trazado. Como m\u00ednimo, debe aportar sondeos, perfil geol\u00f3gico, nivel fre\u00e1tico, ensayos de laboratorio, granulometr\u00eda, presencia de roca o bolos, permeabilidad, agresividad del terreno, par\u00e1metros resistentes y variabilidad geot\u00e9cnica. Esta informaci\u00f3n permite [&hellip;]<\/p>\n","protected":false},"author":80,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[146],"tags":[],"class_list":["post-5622","post","type-post","status-publish","format-standard","hentry","category-preguntas-frecuentes"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Informe geot\u00e9cnico para obras SIN zanja<\/title>\n<meta name=\"description\" content=\"Conozca qu\u00e9 debe incluir un informe geot\u00e9cnico para elegir entre hinca, microt\u00fanel, HDD, Direct Pipe, EPB o hidroescudo.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/eurohinca.com\/en\/what-should-be-included-in-a-geotechnical-report-to-select-the-appropriate-trenchless-technology\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Informe geot\u00e9cnico para obras SIN zanja\" \/>\n<meta property=\"og:description\" content=\"Conozca qu\u00e9 debe incluir un informe geot\u00e9cnico para elegir entre hinca, microt\u00fanel, HDD, Direct Pipe, EPB o hidroescudo.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/eurohinca.com\/en\/what-should-be-included-in-a-geotechnical-report-to-select-the-appropriate-trenchless-technology\/\" \/>\n<meta property=\"og:site_name\" content=\"Eurohinca\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-05T07:23:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-05T07:23:18+00:00\" \/>\n<meta name=\"author\" content=\"seouser\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"seouser\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/eurohinca.com\\\/que-debe-incluir-un-informe-geotecnico-para-seleccionar-la-tecnologia-sin-zanja-adecuada\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/eurohinca.com\\\/que-debe-incluir-un-informe-geotecnico-para-seleccionar-la-tecnologia-sin-zanja-adecuada\\\/\"},\"author\":{\"name\":\"seouser\",\"@id\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/#\\\/schema\\\/person\\\/2f455d0a7e0cf82717efa1161f5b8477\"},\"headline\":\"\u00bfQu\u00e9 debe incluir un informe geot\u00e9cnico para seleccionar la tecnolog\u00eda sin zanja adecuada?\",\"datePublished\":\"2026-06-05T07:23:15+00:00\",\"dateModified\":\"2026-06-05T07:23:18+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/eurohinca.com\\\/que-debe-incluir-un-informe-geotecnico-para-seleccionar-la-tecnologia-sin-zanja-adecuada\\\/\"},\"wordCount\":619,\"publisher\":{\"@id\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/#organization\"},\"articleSection\":[\"Preguntas frecuentes\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/eurohinca.com\\\/que-debe-incluir-un-informe-geotecnico-para-seleccionar-la-tecnologia-sin-zanja-adecuada\\\/\",\"url\":\"https:\\\/\\\/eurohinca.com\\\/que-debe-incluir-un-informe-geotecnico-para-seleccionar-la-tecnologia-sin-zanja-adecuada\\\/\",\"name\":\"Informe geot\u00e9cnico para obras SIN zanja\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/#website\"},\"datePublished\":\"2026-06-05T07:23:15+00:00\",\"dateModified\":\"2026-06-05T07:23:18+00:00\",\"description\":\"Conozca qu\u00e9 debe incluir un informe geot\u00e9cnico para elegir entre hinca, microt\u00fanel, HDD, Direct Pipe, EPB o hidroescudo.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/eurohinca.com\\\/que-debe-incluir-un-informe-geotecnico-para-seleccionar-la-tecnologia-sin-zanja-adecuada\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/eurohinca.com\\\/que-debe-incluir-un-informe-geotecnico-para-seleccionar-la-tecnologia-sin-zanja-adecuada\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/eurohinca.com\\\/que-debe-incluir-un-informe-geotecnico-para-seleccionar-la-tecnologia-sin-zanja-adecuada\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/eurohinca.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u00bfQu\u00e9 debe incluir un informe geot\u00e9cnico para seleccionar la tecnolog\u00eda sin zanja adecuada?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/\",\"name\":\"Eurohinca\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/#organization\",\"name\":\"Eurohinca\",\"url\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/eurohinca.com\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/Logo-nuevo.png\",\"contentUrl\":\"https:\\\/\\\/eurohinca.com\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/Logo-nuevo.png\",\"width\":512,\"height\":131,\"caption\":\"Eurohinca\"},\"image\":{\"@id\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/#\\\/schema\\\/person\\\/2f455d0a7e0cf82717efa1161f5b8477\",\"name\":\"seouser\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Informe geot\u00e9cnico para obras SIN zanja","description":"Conozca qu\u00e9 debe incluir un informe geot\u00e9cnico para elegir entre hinca, microt\u00fanel, HDD, Direct Pipe, EPB o hidroescudo.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/eurohinca.com\/en\/what-should-be-included-in-a-geotechnical-report-to-select-the-appropriate-trenchless-technology\/","og_locale":"en_US","og_type":"article","og_title":"Informe geot\u00e9cnico para obras SIN zanja","og_description":"Conozca qu\u00e9 debe incluir un informe geot\u00e9cnico para elegir entre hinca, microt\u00fanel, HDD, Direct Pipe, EPB o hidroescudo.","og_url":"https:\/\/eurohinca.com\/en\/what-should-be-included-in-a-geotechnical-report-to-select-the-appropriate-trenchless-technology\/","og_site_name":"Eurohinca","article_published_time":"2026-06-05T07:23:15+00:00","article_modified_time":"2026-06-05T07:23:18+00:00","author":"seouser","twitter_card":"summary_large_image","twitter_misc":{"Written by":"seouser","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/eurohinca.com\/que-debe-incluir-un-informe-geotecnico-para-seleccionar-la-tecnologia-sin-zanja-adecuada\/#article","isPartOf":{"@id":"https:\/\/eurohinca.com\/que-debe-incluir-un-informe-geotecnico-para-seleccionar-la-tecnologia-sin-zanja-adecuada\/"},"author":{"name":"seouser","@id":"https:\/\/eurohinca.com\/es\/#\/schema\/person\/2f455d0a7e0cf82717efa1161f5b8477"},"headline":"\u00bfQu\u00e9 debe incluir un informe geot\u00e9cnico para seleccionar la tecnolog\u00eda sin zanja adecuada?","datePublished":"2026-06-05T07:23:15+00:00","dateModified":"2026-06-05T07:23:18+00:00","mainEntityOfPage":{"@id":"https:\/\/eurohinca.com\/que-debe-incluir-un-informe-geotecnico-para-seleccionar-la-tecnologia-sin-zanja-adecuada\/"},"wordCount":619,"publisher":{"@id":"https:\/\/eurohinca.com\/es\/#organization"},"articleSection":["Preguntas frecuentes"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/eurohinca.com\/que-debe-incluir-un-informe-geotecnico-para-seleccionar-la-tecnologia-sin-zanja-adecuada\/","url":"https:\/\/eurohinca.com\/que-debe-incluir-un-informe-geotecnico-para-seleccionar-la-tecnologia-sin-zanja-adecuada\/","name":"Informe geot\u00e9cnico para obras SIN zanja","isPartOf":{"@id":"https:\/\/eurohinca.com\/es\/#website"},"datePublished":"2026-06-05T07:23:15+00:00","dateModified":"2026-06-05T07:23:18+00:00","description":"Conozca qu\u00e9 debe incluir un informe geot\u00e9cnico para elegir entre hinca, microt\u00fanel, HDD, Direct Pipe, EPB o hidroescudo.","breadcrumb":{"@id":"https:\/\/eurohinca.com\/que-debe-incluir-un-informe-geotecnico-para-seleccionar-la-tecnologia-sin-zanja-adecuada\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/eurohinca.com\/que-debe-incluir-un-informe-geotecnico-para-seleccionar-la-tecnologia-sin-zanja-adecuada\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/eurohinca.com\/que-debe-incluir-un-informe-geotecnico-para-seleccionar-la-tecnologia-sin-zanja-adecuada\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/eurohinca.com\/"},{"@type":"ListItem","position":2,"name":"\u00bfQu\u00e9 debe incluir un informe geot\u00e9cnico para seleccionar la tecnolog\u00eda sin zanja adecuada?"}]},{"@type":"WebSite","@id":"https:\/\/eurohinca.com\/es\/#website","url":"https:\/\/eurohinca.com\/es\/","name":"Eurohinca","description":"","publisher":{"@id":"https:\/\/eurohinca.com\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/eurohinca.com\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/eurohinca.com\/es\/#organization","name":"Eurohinca","url":"https:\/\/eurohinca.com\/es\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eurohinca.com\/es\/#\/schema\/logo\/image\/","url":"https:\/\/eurohinca.com\/wp-content\/uploads\/2024\/01\/Logo-nuevo.png","contentUrl":"https:\/\/eurohinca.com\/wp-content\/uploads\/2024\/01\/Logo-nuevo.png","width":512,"height":131,"caption":"Eurohinca"},"image":{"@id":"https:\/\/eurohinca.com\/es\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/eurohinca.com\/es\/#\/schema\/person\/2f455d0a7e0cf82717efa1161f5b8477","name":"seouser"}]}},"_links":{"self":[{"href":"https:\/\/eurohinca.com\/en\/wp-json\/wp\/v2\/posts\/5622","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eurohinca.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eurohinca.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eurohinca.com\/en\/wp-json\/wp\/v2\/users\/80"}],"replies":[{"embeddable":true,"href":"https:\/\/eurohinca.com\/en\/wp-json\/wp\/v2\/comments?post=5622"}],"version-history":[{"count":2,"href":"https:\/\/eurohinca.com\/en\/wp-json\/wp\/v2\/posts\/5622\/revisions"}],"predecessor-version":[{"id":5624,"href":"https:\/\/eurohinca.com\/en\/wp-json\/wp\/v2\/posts\/5622\/revisions\/5624"}],"wp:attachment":[{"href":"https:\/\/eurohinca.com\/en\/wp-json\/wp\/v2\/media?parent=5622"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eurohinca.com\/en\/wp-json\/wp\/v2\/categories?post=5622"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eurohinca.com\/en\/wp-json\/wp\/v2\/tags?post=5622"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}