{"id":4942,"date":"2025-12-10T09:24:55","date_gmt":"2025-12-10T09:24:55","guid":{"rendered":"https:\/\/eurohinca.com\/?p=4942"},"modified":"2026-05-13T10:53:32","modified_gmt":"2026-05-13T10:53:32","slug":"what-are-the-civil-works-and-manholes-requirements-for-a-pipeline-jacking-project","status":"publish","type":"post","link":"https:\/\/eurohinca.com\/en\/que-requisitos-de-obra-civil-y-de-pozos-de-ataque-recepcion-exige-un-proyecto-de-hinca-de-tuberia\/","title":{"rendered":"What are the civil works and manhole requirements for a pipe jacking project?"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"4942\" class=\"elementor elementor-4942\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-d6327ef e-flex e-con-boxed e-con e-parent\" data-id=\"d6327ef\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-0d3dfe2 elementor-widget elementor-widget-text-editor\" data-id=\"0d3dfe2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"480\" data-end=\"912\">The correct execution of a microtunnel depends to a large extent on the design and construction of the <strong data-start=\"575\" data-end=\"606\">attack and reception wells<\/strong>, as well as the associated civil works. These elements are essential to ensure the safe deployment of the TBM, the thrust of the pipe and the geometric control of the tunnel. Their design must respond to the geotechnics, the available space, the diameter of the conduit and the conditions of the environment.<\/p><p data-start=\"914\" data-end=\"1022\">Eurohinca defines the minimum requirements based on its more than 250 sections executed since 1996.<\/p><h2 data-start=\"1029\" data-end=\"1069\"><strong data-start=\"1032\" data-end=\"1069\">1. Attack well (jacking well)<\/strong><\/h2><p data-start=\"1071\" data-end=\"1230\">The attack shaft is the main element, since it houses the <strong data-start=\"1133\" data-end=\"1154\">thrust bed<\/strong>, the <strong data-start=\"1159\" data-end=\"1167\">MTBM<\/strong>, pipe logistics and ancillary equipment. Must comply:<\/p><h3 data-start=\"1232\" data-end=\"1278\"><strong data-start=\"1236\" data-end=\"1278\">Structural and geometrical requirements<\/strong><\/h3><ul data-start=\"1279\" data-end=\"1577\"><li data-start=\"1279\" data-end=\"1368\"><p data-start=\"1281\" data-end=\"1368\">Adequate dimensions for the tunnel boring machine, the pushing system and the pipe maneuvering system.<\/p><\/li><li data-start=\"1369\" data-end=\"1443\"><p data-start=\"1371\" data-end=\"1443\">Bottom level compatible with the <strong data-start=\"1404\" data-end=\"1430\">alignment and slope<\/strong> tunnel.<\/p><\/li><li data-start=\"1444\" data-end=\"1577\"><p data-start=\"1446\" data-end=\"1577\">Stability against water table and lateral pressures, with solutions such as screens, sheet piles, piles or concrete walls.<\/p><\/li><\/ul><h3 data-start=\"1579\" data-end=\"1609\"><strong data-start=\"1583\" data-end=\"1609\">Functional requirements<\/strong><\/h3><ul data-start=\"1610\" data-end=\"1825\"><li data-start=\"1610\" data-end=\"1694\"><p data-start=\"1612\" data-end=\"1694\">Sufficient access for cranes, piping, sludge plant and debris removal.<\/p><\/li><li data-start=\"1695\" data-end=\"1766\"><p data-start=\"1697\" data-end=\"1766\">Safe platform for shield mounting and head alignment.<\/p><\/li><li data-start=\"1767\" data-end=\"1825\"><p data-start=\"1769\" data-end=\"1825\">Drainage, drainage, drainage, ventilation and lighting systems.<\/p><\/li><\/ul><p data-start=\"1827\" data-end=\"2046\">Many examples of these wells can be seen in the land and urban infrastructure works reported in <strong data-start=\"1934\" data-end=\"2042\"><a class=\"decorated-link\" href=\"https:\/\/eurohinca.com\/en\/subway-terrestrial-applications\/\" target=\"_new\" rel=\"noopener\" data-start=\"1936\" data-end=\"2040\">terrestrial and subway applications<\/a><\/strong>.<\/p><h2 data-start=\"2053\" data-end=\"2080\"><strong data-start=\"2056\" data-end=\"2080\">2. Reception well<\/strong><\/h2><p data-start=\"2082\" data-end=\"2201\">The exit shaft must allow the recovery of the TBM and receive the pipe without compromising the integrity of the route.<\/p><h3 data-start=\"2203\" data-end=\"2233\"><strong data-start=\"2207\" data-end=\"2233\">Main requirements<\/strong><\/h3><ul data-start=\"2234\" data-end=\"2453\"><li data-start=\"2234\" data-end=\"2305\"><p data-start=\"2236\" data-end=\"2305\">Dimensions to recover the MTBM, shield and pipe train.<\/p><\/li><li data-start=\"2306\" data-end=\"2376\"><p data-start=\"2308\" data-end=\"2376\">Lifting systems and space for safe head removal.<\/p><\/li><li data-start=\"2377\" data-end=\"2453\"><p data-start=\"2379\" data-end=\"2453\">Seepage control by means of screens, waterproofing or pumping.<\/p><\/li><\/ul><p data-start=\"2455\" data-end=\"2709\">In sensitive areas or in coastal works, this well is integrated with hydraulic or marine structures, as shown in the projects of <strong data-start=\"2587\" data-end=\"2705\"><a class=\"decorated-link\" href=\"https:\/\/eurohinca.com\/en\/efficient-catchments-and-returns-for-aquaculture\/\" target=\"_new\" rel=\"noopener\" data-start=\"2589\" data-end=\"2703\">submarine outfalls and catchments<\/a><\/strong>.<\/p><h2 data-start=\"2716\" data-end=\"2758\"><strong data-start=\"2719\" data-end=\"2758\">3. Length, alignment and logistics<\/strong><\/h2><p data-start=\"2760\" data-end=\"2796\">The wells must be located respecting:<\/p><ul data-start=\"2798\" data-end=\"2980\"><li data-start=\"2798\" data-end=\"2854\"><p data-start=\"2800\" data-end=\"2854\">Maximum driving length to avoid overstressing.<\/p><\/li><li data-start=\"2855\" data-end=\"2914\"><p data-start=\"2857\" data-end=\"2914\">Minimum radii of curvature of the system <strong data-start=\"2897\" data-end=\"2911\">pipe-joint<\/strong>.<\/p><\/li><li data-start=\"2915\" data-end=\"2980\"><p data-start=\"2917\" data-end=\"2980\">Accessible areas for piping, sludge, power and tools.<\/p><\/li><\/ul><p data-start=\"2982\" data-end=\"3223\">In curved microtunnels or those with complex geometries, such as the <strong data-start=\"3043\" data-end=\"3141\"><a class=\"decorated-link\" href=\"https:\/\/eurohinca.com\/en\/works\/microtunnel-in-arenao-curve\/\" target=\"_new\" rel=\"noopener\" data-start=\"3045\" data-end=\"3139\">microtunnel in El Arenao curve<\/a><\/strong>, The position and orientation of the well are decisive in order to comply with the layout.<\/p><h2 data-start=\"3230\" data-end=\"3273\"><strong data-start=\"3233\" data-end=\"3273\">4. Mandatory auxiliary services<\/strong><\/h2><p data-start=\"3275\" data-end=\"3323\">A pile-driving project requires the availability of:<\/p><ul data-start=\"3325\" data-end=\"3728\"><li data-start=\"3325\" data-end=\"3402\"><p data-start=\"3327\" data-end=\"3402\"><strong data-start=\"3327\" data-end=\"3356\">Sludge and return plant<\/strong>, with tanks, pumps and mixing equipment.<\/p><\/li><li data-start=\"3403\" data-end=\"3495\"><p data-start=\"3405\" data-end=\"3495\"><strong data-start=\"3405\" data-end=\"3426\">Pusher bedplate<\/strong> with sufficient capacity for the diameter and length of the section.<\/p><\/li><li data-start=\"3496\" data-end=\"3654\"><p data-start=\"3498\" data-end=\"3654\">Systems of <strong data-start=\"3510\" data-end=\"3529\">safety and HSE<\/strong>, including ventilation, safe access, certified ladders, atmospheric monitoring equipment and rescue plan.<\/p><\/li><li data-start=\"3655\" data-end=\"3728\"><p data-start=\"3657\" data-end=\"3728\">Storage areas for pipe, lubricants, bentonite and consumables.<\/p><\/li><\/ul><p data-start=\"3730\" data-end=\"3942\">The article <strong data-start=\"3742\" data-end=\"3869\"><a class=\"decorated-link cursor-pointer\" target=\"_new\" rel=\"noopener\" data-start=\"3744\" data-end=\"3867\">how to choose between microtunneling, HDD and Direct Pipe<\/a><\/strong> summarizes the relationship between logistics, construction method and civil works.<\/p><h2 data-start=\"3949\" data-end=\"3986\"><strong data-start=\"3952\" data-end=\"3986\">5. Additional considerations<\/strong><\/h2><ul data-start=\"3988\" data-end=\"4207\"><li data-start=\"3988\" data-end=\"4045\"><p data-start=\"3990\" data-end=\"4045\">Coordination with affected utility owners.<\/p><\/li><li data-start=\"4046\" data-end=\"4096\"><p data-start=\"4048\" data-end=\"4096\">Management of civil works and occupancy permits.<\/p><\/li><li data-start=\"4097\" data-end=\"4158\"><p data-start=\"4099\" data-end=\"4158\">Access planning in urban or industrial areas.<\/p><\/li><li data-start=\"4159\" data-end=\"4207\"><p data-start=\"4161\" data-end=\"4207\">Noise, vibration and schedule constraints.<\/p><\/li><\/ul><p data-start=\"4209\" data-end=\"4504\">Civil works requirements may vary depending on the diameter, geotechnics and whether urban, railway, road or hydraulic crossings are involved. The section of <strong data-start=\"4384\" data-end=\"4439\"><a class=\"decorated-link\" href=\"https:\/\/eurohinca.com\/en\/works\/\" target=\"_new\" rel=\"noopener\" data-start=\"4386\" data-end=\"4437\">works executed<\/a><\/strong> shows the diversity of configurations used in the field.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>La correcta ejecuci\u00f3n de un microt\u00fanel depende en gran medida del dise\u00f1o y construcci\u00f3n de los pozos de ataque y recepci\u00f3n, as\u00ed como de la obra civil asociada. Estos elementos son esenciales para garantizar la implantaci\u00f3n segura de la tuneladora, el empuje de la tuber\u00eda y el control geom\u00e9trico del t\u00fanel. Su dise\u00f1o debe responder [&hellip;]<\/p>\n","protected":false},"author":80,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[146],"tags":[],"class_list":["post-4942","post","type-post","status-publish","format-standard","hentry","category-preguntas-frecuentes"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Requisitos de pozos de ataque y recepci\u00f3n en hinca<\/title>\n<meta name=\"description\" content=\"Pozos de ataque y recepci\u00f3n en hinca de tuber\u00eda: requisitos de dise\u00f1o, obra civil, geotecnia, equipos, seguridad y planificaci\u00f3n.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/eurohinca.com\/en\/what-are-the-civil-works-and-manholes-requirements-for-a-pipeline-jacking-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Requisitos de pozos de ataque y recepci\u00f3n en hinca\" \/>\n<meta property=\"og:description\" content=\"Pozos de ataque y recepci\u00f3n en hinca de tuber\u00eda: requisitos de dise\u00f1o, obra civil, geotecnia, equipos, seguridad y planificaci\u00f3n.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/eurohinca.com\/en\/what-are-the-civil-works-and-manholes-requirements-for-a-pipeline-jacking-project\/\" \/>\n<meta property=\"og:site_name\" content=\"Eurohinca\" \/>\n<meta property=\"article:published_time\" content=\"2025-12-10T09:24:55+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-13T10:53:32+00:00\" \/>\n<meta name=\"author\" content=\"seouser\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"seouser\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/eurohinca.com\\\/que-requisitos-de-obra-civil-y-de-pozos-de-ataque-recepcion-exige-un-proyecto-de-hinca-de-tuberia\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/eurohinca.com\\\/que-requisitos-de-obra-civil-y-de-pozos-de-ataque-recepcion-exige-un-proyecto-de-hinca-de-tuberia\\\/\"},\"author\":{\"name\":\"seouser\",\"@id\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/#\\\/schema\\\/person\\\/2f455d0a7e0cf82717efa1161f5b8477\"},\"headline\":\"\u00bfQu\u00e9 requisitos de obra civil y de pozos de ataque\\\/recepci\u00f3n exige un proyecto de hinca de tuber\u00eda?\",\"datePublished\":\"2025-12-10T09:24:55+00:00\",\"dateModified\":\"2026-05-13T10:53:32+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/eurohinca.com\\\/que-requisitos-de-obra-civil-y-de-pozos-de-ataque-recepcion-exige-un-proyecto-de-hinca-de-tuberia\\\/\"},\"wordCount\":592,\"publisher\":{\"@id\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/#organization\"},\"articleSection\":[\"Preguntas frecuentes\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/eurohinca.com\\\/que-requisitos-de-obra-civil-y-de-pozos-de-ataque-recepcion-exige-un-proyecto-de-hinca-de-tuberia\\\/\",\"url\":\"https:\\\/\\\/eurohinca.com\\\/que-requisitos-de-obra-civil-y-de-pozos-de-ataque-recepcion-exige-un-proyecto-de-hinca-de-tuberia\\\/\",\"name\":\"Requisitos de pozos de ataque y recepci\u00f3n en hinca\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/#website\"},\"datePublished\":\"2025-12-10T09:24:55+00:00\",\"dateModified\":\"2026-05-13T10:53:32+00:00\",\"description\":\"Pozos de ataque y recepci\u00f3n en hinca de tuber\u00eda: requisitos de dise\u00f1o, obra civil, geotecnia, equipos, seguridad y planificaci\u00f3n.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/eurohinca.com\\\/que-requisitos-de-obra-civil-y-de-pozos-de-ataque-recepcion-exige-un-proyecto-de-hinca-de-tuberia\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/eurohinca.com\\\/que-requisitos-de-obra-civil-y-de-pozos-de-ataque-recepcion-exige-un-proyecto-de-hinca-de-tuberia\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/eurohinca.com\\\/que-requisitos-de-obra-civil-y-de-pozos-de-ataque-recepcion-exige-un-proyecto-de-hinca-de-tuberia\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/eurohinca.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u00bfQu\u00e9 requisitos de obra civil y de pozos de ataque\\\/recepci\u00f3n exige un proyecto de hinca de tuber\u00eda?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/\",\"name\":\"Eurohinca\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/#organization\",\"name\":\"Eurohinca\",\"url\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/eurohinca.com\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/Logo-nuevo.png\",\"contentUrl\":\"https:\\\/\\\/eurohinca.com\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/Logo-nuevo.png\",\"width\":512,\"height\":131,\"caption\":\"Eurohinca\"},\"image\":{\"@id\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/eurohinca.com\\\/es\\\/#\\\/schema\\\/person\\\/2f455d0a7e0cf82717efa1161f5b8477\",\"name\":\"seouser\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Pile-driving and receiving well requirements","description":"Pipe jacking and receiving wells: design, civil work, geotechnical, equipment, safety and planning requirements.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/eurohinca.com\/en\/what-are-the-civil-works-and-manholes-requirements-for-a-pipeline-jacking-project\/","og_locale":"en_US","og_type":"article","og_title":"Requisitos de pozos de ataque y recepci\u00f3n en hinca","og_description":"Pozos de ataque y recepci\u00f3n en hinca de tuber\u00eda: requisitos de dise\u00f1o, obra civil, geotecnia, equipos, seguridad y planificaci\u00f3n.","og_url":"https:\/\/eurohinca.com\/en\/what-are-the-civil-works-and-manholes-requirements-for-a-pipeline-jacking-project\/","og_site_name":"Eurohinca","article_published_time":"2025-12-10T09:24:55+00:00","article_modified_time":"2026-05-13T10:53:32+00:00","author":"seouser","twitter_card":"summary_large_image","twitter_misc":{"Written by":"seouser","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/eurohinca.com\/que-requisitos-de-obra-civil-y-de-pozos-de-ataque-recepcion-exige-un-proyecto-de-hinca-de-tuberia\/#article","isPartOf":{"@id":"https:\/\/eurohinca.com\/que-requisitos-de-obra-civil-y-de-pozos-de-ataque-recepcion-exige-un-proyecto-de-hinca-de-tuberia\/"},"author":{"name":"seouser","@id":"https:\/\/eurohinca.com\/es\/#\/schema\/person\/2f455d0a7e0cf82717efa1161f5b8477"},"headline":"\u00bfQu\u00e9 requisitos de obra civil y de pozos de ataque\/recepci\u00f3n exige un proyecto de hinca de tuber\u00eda?","datePublished":"2025-12-10T09:24:55+00:00","dateModified":"2026-05-13T10:53:32+00:00","mainEntityOfPage":{"@id":"https:\/\/eurohinca.com\/que-requisitos-de-obra-civil-y-de-pozos-de-ataque-recepcion-exige-un-proyecto-de-hinca-de-tuberia\/"},"wordCount":592,"publisher":{"@id":"https:\/\/eurohinca.com\/es\/#organization"},"articleSection":["Preguntas frecuentes"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/eurohinca.com\/que-requisitos-de-obra-civil-y-de-pozos-de-ataque-recepcion-exige-un-proyecto-de-hinca-de-tuberia\/","url":"https:\/\/eurohinca.com\/que-requisitos-de-obra-civil-y-de-pozos-de-ataque-recepcion-exige-un-proyecto-de-hinca-de-tuberia\/","name":"Pile-driving and receiving well requirements","isPartOf":{"@id":"https:\/\/eurohinca.com\/es\/#website"},"datePublished":"2025-12-10T09:24:55+00:00","dateModified":"2026-05-13T10:53:32+00:00","description":"Pipe jacking and receiving wells: design, civil work, geotechnical, equipment, safety and planning requirements.","breadcrumb":{"@id":"https:\/\/eurohinca.com\/que-requisitos-de-obra-civil-y-de-pozos-de-ataque-recepcion-exige-un-proyecto-de-hinca-de-tuberia\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/eurohinca.com\/que-requisitos-de-obra-civil-y-de-pozos-de-ataque-recepcion-exige-un-proyecto-de-hinca-de-tuberia\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/eurohinca.com\/que-requisitos-de-obra-civil-y-de-pozos-de-ataque-recepcion-exige-un-proyecto-de-hinca-de-tuberia\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/eurohinca.com\/"},{"@type":"ListItem","position":2,"name":"\u00bfQu\u00e9 requisitos de obra civil y de pozos de ataque\/recepci\u00f3n exige un proyecto de hinca de tuber\u00eda?"}]},{"@type":"WebSite","@id":"https:\/\/eurohinca.com\/es\/#website","url":"https:\/\/eurohinca.com\/es\/","name":"Eurohinca","description":"","publisher":{"@id":"https:\/\/eurohinca.com\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/eurohinca.com\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/eurohinca.com\/es\/#organization","name":"Eurohinca","url":"https:\/\/eurohinca.com\/es\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eurohinca.com\/es\/#\/schema\/logo\/image\/","url":"https:\/\/eurohinca.com\/wp-content\/uploads\/2024\/01\/Logo-nuevo.png","contentUrl":"https:\/\/eurohinca.com\/wp-content\/uploads\/2024\/01\/Logo-nuevo.png","width":512,"height":131,"caption":"Eurohinca"},"image":{"@id":"https:\/\/eurohinca.com\/es\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/eurohinca.com\/es\/#\/schema\/person\/2f455d0a7e0cf82717efa1161f5b8477","name":"seouser"}]}},"_links":{"self":[{"href":"https:\/\/eurohinca.com\/en\/wp-json\/wp\/v2\/posts\/4942","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eurohinca.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eurohinca.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eurohinca.com\/en\/wp-json\/wp\/v2\/users\/80"}],"replies":[{"embeddable":true,"href":"https:\/\/eurohinca.com\/en\/wp-json\/wp\/v2\/comments?post=4942"}],"version-history":[{"count":4,"href":"https:\/\/eurohinca.com\/en\/wp-json\/wp\/v2\/posts\/4942\/revisions"}],"predecessor-version":[{"id":4946,"href":"https:\/\/eurohinca.com\/en\/wp-json\/wp\/v2\/posts\/4942\/revisions\/4946"}],"wp:attachment":[{"href":"https:\/\/eurohinca.com\/en\/wp-json\/wp\/v2\/media?parent=4942"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eurohinca.com\/en\/wp-json\/wp\/v2\/categories?post=4942"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eurohinca.com\/en\/wp-json\/wp\/v2\/tags?post=4942"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}